See the Platform in Action
Six scenarios. Four buyer perspectives. Each demo walks a real consequence chain — detection, intervention, resolution, and the experience the platform retains when it is over. These are illustrative walkthroughs showing how Synestria is designed to think and what its outputs are designed to look like — not screenshots from a production deployment.
The Fiber Ghost
A fiber link in the training fabric degrades below alarm threshold and keeps reporting healthy. GPU peer synchronization breaks down. Training throughput drops. The checkpoint tax begins accumulating. Synestria traces the cause in 0.8 seconds.
The Thermal Cascade
AI training workload increases 23%. Liquid cooling zone B thermal margin tightens. A high density GPU cluster enters thermal protection. Inference throughput drops. Economic Availability projects downward. Synestria closes the consequence before it compounds.
The First 30 Days
An MVP rack arrives at a facility. DataVox completes physical installation. Synestria comes online, connects to all four infrastructure domains, and begins building the EA baseline. By day 30, the gap is quantified. The performance contract conversation begins.
The Commissioning Defect
Data Center 07 is completing commissioning verification before first load. Synestria identifies a cooling circuit bypass valve in the wrong state. Projects the consequence chain it would have caused. Defect corrected before go-live. $180K in rework cost avoided.
Consequence Closed
CDU-B4 thermal anomaly detected at 44.1°C. Consequence chain traced: thermal → compute → power. Two interventions proposed — CRAC setpoint and workload migration. Operator authorizes. System executes. CONSEQUENCE CLOSED in 47 seconds. 42 kW recovered. GPU throttle avoided.
Fleet View
Six sites. 855 MW total. $47.2M fleet ARR run-rate. Active consequence chains surfacing across PHX-A and ATL-C simultaneously. Cross-site event feed updating in real time. Fleet EA at 94.8 percent. This is what scaled consequence intelligence looks like from the operations center.
Illustrative Operations Console
Illustrative Campus — 3 buildings, 1,080 MW, synthetic sensor telemetry updating continuously across all four domains. Active events queue, consequence chain tracking, pattern library counter, consequence memory feed. Not a walkthrough. A running platform.